Skip to content

The BUKU Music & Art Project

Share this Post:

Sound Co
Onstage Systems

Venue
Mardi Gras World
New Orleans, LA

Crew

FOH Engineer: Eric Thomas

Monitor Engineer: Jake Chamley

Systems Engineer: Eric Thomas

System Techs: Thomas Dowdy, Theron Rodriguez

 

Gear

FOH

Console: Avid VENUE Profile

Speakers: L-Acoustics K1 (24), K1-SB (8), KARA (14), SB-28 (36)

Amps: L-Acoustics LA8 (30)

Processing: Lake LM44

Power Distro: Motion Labs

Breakout/Snake Assemblies: Ramtech

 

MON

Console: Avid VENUE Profile

Speakers: L-Acoustics ARCS, Clair Brothers 12AM wedges

Amps: L-Acoustics LA8

Mics: Sennheiser, Shure

 

More Event Details: The March 21-22 event featured The Flaming Lips, David Guetta, Ellie Goulding, Kaskade, Zedd and more than 60 other acts. The event took place at the waterfront Mardi Gras World tourist attraction, the primary site for the assembly of elaborate Mardi Gras parade floats.