Tour
Reputation Stadium Tour
Sound Co
Eighth Day Sound
Crew
FOH Engineer: David Payne
Monitor Engineers: Jordan Kolenc (artist/guests), Scott Wasilk (band)
Systems Engineer: Dan Bluhm
Assistant Systems Engineer/Delays: Chase Usry
Monitor/Stage Tech: Eoin “Lad” Collins
RF Coordinator: Ike Zimbel
RF Tech: Turner “Plarse” Pollari
P.A. Techs: Liam “Lili” Von Elbe, Andy “Dude Boy” Dudash, Slam Balk, Mike “Voltage” Vultaggio, JP Kearney (U.K. leg)
Audio Crew Chief: Jordan Kolenc
Production Manager: Arthur Kemish
Stage Manager: Dewey Sheppard
Gear
FOH System
Consoles: (2) DiGiCo SD7
Main/Side P.A.: Four hangs of (24) d&b audiotechnik J8; two hangs with (12) J-SUBs
270 P.A.: Two hangs of (12) d&b J8
360 P.A: Two Hangs of (6) d&b V8
Front Fills: (24) d&b V8
Ground Subs: (38) d&b B22
Delays: Four hangs (12) d&b J8
Amps: d&b D80 w/ array processing
Processing/Outboard: Lake LM44, Neve Designs Portico II, Neve Designs MBP, TC Electronic 3000, Lexicon PCM92, Bricasti M7, SPL TD4, (2) Eventide Eclipse, (2) Waves Soundgrid v9, Universal Audio Realtime Rack
MON System
Consoles: (2) DiGiCo SD7
IEM’s: (24 Channels) Shure PSM 1000, JH Audio JH-16 v2 IEMs
RF: 8ch Sennheiser 9000, 10ch Sennheiser 6000, 16ch Shure Axient Digital, RAD Wireless Com, Wisycom MFL RF over fiber system
Processing: TC Electronic System 6000, Bricasti M7, Eventide Eclipse (2), SPL TD4 (2), Waves Soundgrid Extreme Server v9 (4), Universal Audio Realtime Rack
Mics: Sennheiser MD 935, e935; Shure Beta 91, 52, 56; AKG 414 ULS, A-T 450
Misc: Radial Engineering JS2, JS3, J RAK 4, Tonebone Mix Blender
Tour Notes:
Taylor Swift’s Reputation stadium tour, which ran from May 8 to Nov. 21 with a string of shows in the U.S., U.K. and Ireland, another leg in North America plus a few dates in Australia, New Zealand and Japan, broke Billboard’s record for the highest-grossing U.S. tour, with total sales in the States exceeding 2 million tickets and $266.1 million in revenues. Together with the overseas gigs, the total gross from 53 shows topped out at $315.2 million.