Skip to content

Rock USA

Share this Post:

Sound Co
Precise Corporate Staging (PCS)

Venue
Ford Festival Grounds,
Oshkosh, WI

Crew

FOH Engineer: Tom Giatron

Monitor Engineer: Jeremy Baca

Systems Engineer: Michael “Woody” Woods

Production Manager: Tom Bodoff

System Techs: Dan Myers, Rusty Gage

Gear

FOH

Consoles: Midas Heritage 4000, Avid Venue Profile, Behringer X32, Yamaha PM5D-RH

Speakers: L-Acoustics V-DOSC (48), dV-DOSC (6), SB-218 (16), SB-28 (24), KUDO (24), EAW KF300s (6)

Amps: L-Acoustics LA48 (50), LA8 (18)

Processing: Dolby Lake, XTA DP448

Power Distro: Motion Labs 200 Amp (x4)

Rigging: CM Lodestar 1 Ton Dual Brake

Breakout/Snake Assemblies: Whirlwind

MON

Speakers: L-Acoustics HiQs (20), SB118 (8), ARCS (16),  Meyer Sound HP600 (4)

Mics: Shure, Sennheiser, Countryman, Beyer, Radial